Bathrooms, ensuites and laundries
Bathroom, ensuite and laundry floors and wall junctions are membraned to the relevant Australian Standard, with wastes, hobs and penetrations sealed before tiling so water stays inside the tiled envelope.

Six Steps, One Crew, No Surprises
Inspect
We check the substrate, falls, wastes, penetrations and wet-area layout before work begins.
Prepare
Surfaces are cleaned and prepared, with cracks, gaps and defects repaired where required.
Detail
Corners, junctions, penetrations, wastes and other critical areas are sealed and detailed.
Prime
The correct primer is selected and applied to suit the substrate and moisture conditions.
Waterproof
The specified membrane system is applied to the required areas and film build.
Inspect & Handover
We complete a final waterproofing inspection before the area is released for tiling or finishes.
7 Years, Transferable To The Next Owner
Every project comes with a 7-year written warranty that transfers to the next owner at no extra cost — because good waterproofing should outlast the sale.
Get Free Inspection